Documents

Below are some documents that provide information about Amtrak Cascades, the East-West passenger rail project, and the proposed Northwest High-Speed Rail system.

2025 FRA Long-Distance Service Study

PRELIMINARY SERVICE DEVELOPMENT PLAN ALTERNATIVES DEVELOPMENT AND RECOMMENDATIONS REPORT June 2024

2024 Amtrak Cascades Preliminary Service Development Plan: Draft Alternatives Development and Recommendations Report

2024 One Pager - Cascades and Pacific Central Station

2021 Report on Passenger Rail Agreements, Service Performance and Finance

2020 Final Report: Feasibility of an East-West Intercity Passenger Rail System for Washington State (PDF)

2019 Washington State Rail System Plan (PDF)

2019 Ultra High-Speed Ground Transportation Business Case Executive Summary (PDF) + Final Analysis (PDF)

2017 Central Washington Stampede Pass Study (PDF)

2017 Service Development Plan For the Pacific Northwest Rail Corridor Program

2016 WSDOT Station Stop Policy Guidance Document (PDF)

2014 Washington State Rail Plan 2013-2035 (PDF)

2006 Amtrak Cascades Long-Range Plan (PDF)

2001 WSDOT East-West Passenger Rail Feasibility Study (PDF)

1992 Washington High Speed Ground Transportation Study (PDF)